The vertical subsidence of the concrete that occurs, when the slump cone is raised, is termed the 'slump' of the concrete.
当提起坍落度筒时,混凝土出现了垂直方向的塌落,称之为混凝土的“坍落度”。
Hence the horizontal displacement field and vertical subsidence surface are got and comparing analysis is given from these two methods.
据此,计算获得了城市地表的水平位移场和垂直位移(沉降)面,并对两种方法获得的结果作了比较。
The post-grouting technique for bored piles can increase the vertical bearing capacity of piles, decrease the subsidence and improve the engineering behaviors of piles.
钻孔灌注桩后压浆技术可提高桩的竖向承载力、减少桩的沉降并改善桩的工程性状。
应用推荐